Lismore Base Hospital Stage 3C - HVAC Refurb

Category

Health

Location

Lismore, NSW

Client

Hansen Yuncken

Year

2021

Hansen Yuncken awarded VAE Group the mechanical services on Lismore Base Hospital Stage 3C.

The works include refurbishment of Heating Ventilation and Air Conditioning (HVAC) equipment on various levels from three to eight in Block C of the hospital. VAE are excited to be back on site at Lismore Base Hospital after completing the Stage 3B2 mechanical services works in 2019.

Stage 3C comprises the construction of an additional four floors to the North Tower (Levels 7 to 10), which will be fully integrated into the existing floors (Levels 3 to 6) of North Tower, to be constructed as part of Stage 3b of the LBH Redevelopment Project. Internal refurbishments to the existing buildings will also occur. 

Stage 3c includes:

  • new inpatient wards, including one medical and one surgical ward
  • a new intensive care unit and high dependency unit
  • additional plant facilities
  • education, training, research and hospital administration facilities

The redevelopment will deliver an increase in health services, and enable new models of care to meet the changing needs of the local community. Construction of Stage 3c includes the refurbishment of the hospital's existing C Block, which is scheduled to be completed mid-2021. The $52.5 million project is being funded by the NSW Government.


#Stage 3B of the LBH Redevelopment Project, and previous stages.