VAE understood that it was crucial that the air handling units were replaced with minimal disruption and without any loss of conditions in the operations rooms. To achieve this we developed strict removal and installation procedures that were approved by Air Services Australia. This included breaking down the AHUs so they could be transported up the building via the life and reassembled on site. Our team also organised the disassembly of existing units and the reassembly of new units which minimised downtime while crucially maintaining conditions.
Brisbane & Cairns Control TowerAir Handling Unit (AHU) Replacements
The key requirement for this project involved VAE replacing air handling units (AHUs) in the control towers in both the Brisbane and Cairns airports with minimal disruption and without loss of conditions in the Air Services Australia operations room and the associated equipment room.
#VAE's Smarter HVAC Solution
#Project Scope
Engineer
- Advisory Services
- Design
- BIM Drafting
- Drafting co-ordination
- Audit
Construct
- Prefabrication
- Installation
- BMS
- Automation
- Electrical
- Co-ordination of Services
Manage
- BMS
- Bureau Performance Management
- Maintenance
- Compliance
- Upgrades
#Key Achievements
01
No interruption to airport operations
02
No loss of conditions at either site.
03
Awarded the chiller replacement projects at Cairns and Melbourne airports.